Punctuality by line, route and station

Intercity buses in Spain

We track 65 intercity lines departing from 25 cities in Spain. Of the 157 rides we measured between 9 October 2026 and 14 October 2026, 64.3% arrived within five minutes of schedule, with a typical delay of 2.8 minutes.

Operators covered: Sagales, FlixBus, Teisa, MonBus, Monbus, DirectBus, Eixbus, Monbus (Sevilla-Alegeciras).

On time
64.3%
≤ 5 min late
Median delay
2.8 min
typical ride
P90 delay
15.3 min
1 in 10 worse than this
Cancelled
0%
0 of 549 rides
Sample
157
157 rides measured · 549 seen

Most reliable lines

LineNameOn timeAvg delayRides
1783Vigo - Porto84.6%2.7 min13
CES062A Coruña - Vigo - L178371.4%3.8 min42

Least reliable lines

LineNameOn timeAvg delayRides
CES062A Coruña - Vigo - L178371.4%3.8 min42
1783Vigo - Porto84.6%2.7 min13

Busiest routes

Busiest stations

Cities

On-time share by departure hour

0%50%100%00:00: 33.3%, 302405:00: 75%, 406:00: 80%, 5607:00: 62.5%, 808:00: 75%, 12809:00: 50%, 610:00: 61.5%, 131011:00: 40%, 512:00: 81.8%, 111213:00: 57.1%, 714:00: 72.7%, 111415:00: 81.8%, 1116:00: 37.5%, 81617:00: 70%, 1018:00: 85.7%, 71819:00: 33.3%, 320:00: 60%, 152021:00: 55.6%, 922:00: 100%, 22223:00: 42.9%, 7

On-time share by weekday

0%50%100%Monday: 78%, 50MonTuesday: 40%, 20TueWednesday: 57.1%, 14WedThuFriSaturday: 83.3%, 12SatSunday: 59%, 61Sun

Last 30 days

0%50%100%10 October 2026: 83.3%, 0.9 min, 121011 October 2026: 58.7%, 3.9 min, 631112 October 2026: 79.2%, 0 min, 481213 October 2026: 38.1%, 8.7 min, 211314 October 2026: 61.5%, 3.5 min, 1314

Worst day so far: 13 October 2026 with 38.1% on time and a P90 delay of 23.6 min (21 rides).

Lines in Spain

Unofficial, independent statistics from public vehicle-tracking data. "On time" means at most 5 minutes late. Coverage is partial; rides without actual times are excluded. Bustempo is an independent, unofficial project. It is not affiliated with, endorsed by or connected to Flix SE, FlixBus, FlixTrain or any other operator. Live data comes from publicly reachable operator endpoints and may be incomplete or delayed.